I took much of the same material that I had used to build the form for the back wall to construct the form for the front wall. You can see here what that form looks like. I had to partially remove the terra-cotta retaining walls and dig away a bunch of dirt to make room for this. It was a big, muddy job for about three days, dismantling, digging, then building the form. Finally, I was able to pour the concrete, which I was able to do just after Thanksgiving, and just before the snow began to fall and the freezing temperatures began. I had to stick a space-heater out in the hobbit-hole in order to prevent the still-wet concrete from freezing.
It has been cold ever since then, and snow that fell before Christmas is still on the ground now. I knew I would have to take a break from construction, but it has been hard to wait, especially when I look out and see the ugly form still there, the retaining bricks stacked haphazardly, and that ugly corrugated metal still exposed. I had hoped to get that covered up with sod this year. Next year it is going to happen!
Here is the best view of it as it looks now (except now it is covered in snow). It has sort of a disemboweled look to it, especially the 2nd and 3rd photos. In the second, I make a cameo apperance. Doh! In the last one, you can see my construction site in all its glory. Usually, I clean up for pictures, but I was going for realism here.
I can't wait to take the form off, finish off the concrete, and put things back together. Then I will finally be ready to bury it.
No comments:
Post a Comment